Yes, and a renovation is the best moment to do it. The interesting questions are about the project rather than the roofing: money held back for the unknown, and whether anyone is living in the house.
Yes — and if a roof is going to need replacing within a few years, a renovation is unambiguously the moment. The technical side is straightforward. What actually determines whether it goes well is project management: when it happens relative to everything else, whether anyone is living in the house, and whether the budget can absorb what turns up under the covering.
Everything that follows is vulnerable to water from above — plaster, decoration, flooring, joinery, electrics, insulation. Roofing is also the trade most exposed to weather, so it needs somewhere in the programme to absorb a bad fortnight.
Putting the roof first removes the largest single risk to everything downstream. Putting it last means a wet spell delays completion of the whole project rather than one phase of it, and a roof that lets go mid-programme ruins finished work.
There is a second reason. The strip is the only opportunity anyone will have to see the roof structure. If rafters, purlins or wall plates need work, you want to know before internal finishes are up — not after.
This changes more than people expect, and it is worth planning around.
If you have bought a property to renovate and have the option of doing the roof before moving in, take it. It is materially easier and usually faster.
The house stays weathertight throughout in either case. Roofs are stripped in sections, not all at once, and open areas are sheeted at the end of each day and when weather requires it.
The roof is the part of a renovation with the largest genuine unknown, and it is unknown to everybody equally — no contractor can see through a covering.
The professional way to handle it is not to hope, and not to accept a quotation that quietly assumes the best. It is to agree the mechanism in advance:
Handled that way, timber found during the strip is a scope conversation. Handled badly, it is the commonest dispute on a re-roof.
A slightly different problem, because the roof is a number you need before you commit rather than after.
On a renovation this is the largest avoidable cost, and it is avoidable simply by sequencing. A scaffold put up for the roof can also serve:
Ask every contractor on the project whether their work needs access above ground floor, and arrange all of them into one scaffold period behind the roofer. Erecting a scaffold twice on the same house is one of the commonest wasted costs in domestic renovation.
An ordinary re-roof renews a thermal element and engages regulation 23 of the Building Regulations 2010: thermal performance must be improved where technically and economically feasible, to 0.16 W/(m²K) for a roof in an existing dwelling under Approved Document L Volume 1.
On a whole-house renovation there is a second threshold. Regulation 35(1) defines a "major renovation" as work to more than 25% of the surface area of the whole building envelope — walls, roof, floors, windows and doors together — which brings wider consequential requirements into play. A project doing the roof, the windows, the render and wall insulation can cross that without anyone noticing.
Raise it with building control at the design stage rather than mid-project. That is either Halton's own service or a Registered Building Control Approver.
The principle: everything needing external access happens in one scaffold period, and nothing internal and vulnerable starts until the building is weathertight above it.
Talk to us at the survey stage rather than the scheduling stage. The roof affects what everything else can do.
Roof replacement in Runcorn →
All roof replacement guides →
Roof Replacement Cheshire →
Yes, in several respects — no need to protect belongings, no disruption to anyone living there, loft access unrestricted, and internal work can follow immediately behind the roofer. If you have the option of doing it before moving in, take it.
There is no universal figure, but the discipline matters more than the number: agree a rate for defective timber with the contractor before work starts, and treat that as a contingency line in the budget rather than an unpleasant surprise. The strip is the only time anyone can see the structure.
A homebuyer's survey will comment on the roof, but usually from the ground and from a brief look in the loft. If the report flags the roof and you are proceeding, a specific roofing assessment before exchange is worth the cost, because it converts a vague concern into a figure you can negotiate with.
You can, and it is a bad idea. Everything internal — plaster, decoration, flooring, electrics — is vulnerable to water from above, and roofing is the trade most exposed to weather. Doing the roof last means one wet fortnight can undo finished work.
Apex Roofing covers Cheshire and the surrounding area for complete roof replacement, new slate and tiled roofs and re-roofing.
Apex Roofing Cheshire · 105 Fence House, Fence Avenue, Macclesfield SK10 1LM
Tell us about the property and the roof in Runcorn, and we will come back to you — usually the same day.
Prefer to talk? Call 07377 461095 · WhatsApp +44 7465 861265 · Email apexroofing14@gmail.com