Most guides tell you how long a re-roof takes. This one covers what you will actually be asked, and when — because there are decision points, and they arrive faster than people expect.
A complete re-roof on an ordinary Runcorn house is not complicated to live through, but there are moments where you will be asked something, and being ready for them makes the difference between a smooth job and a stressful one.
This is the customer's-eye view: what happens, what you will be asked, and what a contractor who is doing the job properly will tell you without being prompted.
If any of those is still vague when the scaffold goes up, it will be settled under time pressure later, which is the worst moment to settle anything.
Usually a day or two before the roofers arrive. It is quick on an ordinary house and longer on an awkward one. If it has to stand on the public footway a licence is needed from Halton Borough Council, and that is often the longest lead item on the whole job, so it will have been applied for well before.
You will notice: reduced light upstairs, people able to see in, and the scaffold staying up for the whole job plus a day or two either side.
The loudest phase and the shortest. The covering, battens and underlay come off — in sections, never the whole roof at once — and go into a skip or down a chute.
You will notice: real noise, dust coming into the loft, and the roof looking alarming for a day. That is normal. The building stays weathertight because only a manageable area is ever open, and anything open is sheeted at the end of the day and whenever weather requires it.
Brief on a sound roof, longer where something needs attention. Rafters, purlins and wall plates are looked at, with particular attention to the rafter ends where they sit on the wall plate — the commonest place for rot, because that is where a failing gutter has been putting water for years.
Ask for photographs. This is the one moment the structure of your house is visible, and once the underlay goes on it is invisible again for decades. The pictures cost nothing and they are your evidence of what was there and what was done about it.
The longest phase, and the quiet one. Underlay, battens, covering, lead, ridge, verges, ventilation.
Worth looking at while you still can:
None of this requires expertise. It requires looking before it disappears. Roofing is layered work and every layer hides the one below it.
Part of the job, not an extra. Renewing the covering renews a thermal element, and regulation 23 of the Building Regulations 2010 requires its thermal performance to be improved where technically and economically feasible — 0.16 W/(m²K) for a roof in an existing dwelling under Approved Document L Volume 1.
On the new-town housing that makes up much of Runcorn, built to the standards of the 1960s and 70s, this is one of the more valuable parts of the work. You can verify it yourself afterwards by looking in the loft.
Decision point two: where the roof space is a habitable room rather than an empty loft, insulation has to go at rafter level, and that choice — over the rafters or under them — affects either the roof line or the head height. It should have been settled at quotation stage, but if it comes up now, do not let it be decided for you on site.
Keep all of it with the deeds. A buyer's solicitor will ask for the certificate and the guarantee, and finding them a decade later is otherwise a problem you have made for yourself.
If any of those happens, raise it that day. Everything on a roof gets covered by something else within about a day, and the conversation is far easier while the thing you are asking about is still in view.
We would rather answer every question before we start than halfway through.
Roof replacement in Runcorn →
All roof replacement guides →
Roof Replacement Cheshire →
Not usually. Loft access may be needed at some point and there will be a conversation if something is found in the structure, but the work itself is external. Agree in advance how you will be contacted if a decision is needed.
Raise it that day, not at the end. Roofing is layered work — the underlay disappears under the battens, the battens under the covering — so anything you want to question is much easier to address while it is still visible.
The exposed structure before it is covered, any defective timber that is replaced, and the lead work at chimneys and abutments. A good contractor will offer these; if not, ask. It is your record of work you will never see again.
You can see it — go into the loft when the job is finished, or ask to see it at rafter level if the roof space is a room. The compliance certificate is the formal evidence, and you should receive it after completion.
Apex Roofing covers Cheshire and the surrounding area for complete roof replacement, new slate and tiled roofs and re-roofing.
Apex Roofing Cheshire · 105 Fence House, Fence Avenue, Macclesfield SK10 1LM
Tell us about the property and the roof in Runcorn, and we will come back to you — usually the same day.
Prefer to talk? Call 07377 461095 · WhatsApp +44 7465 861265 · Email apexroofing14@gmail.com