Rated 5 stars on Google. Happy with the work we did for you? Leave us a Google review
Apex Roofingand Guttering Services Call 07377 461095

Photo Gallery

138 photographs from our own jobs, grouped by town. Click any picture to read what the job involved.

Call 07377 461095 Get a free quote

Our project gallery – completed roofing and guttering work across Cheshire

Altrincham

3 photographs

  • Moss and broken render where the bay roof met the wall
    Moss and broken render where the bay roof met the wall
  • The same junction re-sealed and dressed back against the render
    The same junction re-sealed and dressed back against the render
  • The finished curved bay sweeping round below the first-floor window
    The finished curved bay sweeping round below the first-floor window

Blackpool

10 photographs

  • Moss across the tiles and patched flashing at the chimney abutment
    Moss across the tiles and patched flashing at the chimney abutment
  • New membrane and battens going in where the tiles came off
    New membrane and battens going in where the tiles came off
  • A section opened up beside the stack, ladder laid up the slope
    A section opened up beside the stack, ladder laid up the slope
  • Both pots re-bedded in fresh mortar at the top of the stack
    Both pots re-bedded in fresh mortar at the top of the stack
  • The old bedding round a pot, cracked and breaking away
    The old bedding round a pot, cracked and breaking away
  • The renewed ridge and hip lines along the finished roof
    The renewed ridge and hip lines along the finished roof
  • Old material cleared back between the battens before relaying
    Old material cleared back between the battens before relaying
  • Ridge and hip lines of the tiled roof seen from above
    Ridge and hip lines of the tiled roof seen from above
  • Looking down the finished hips towards the bungalows opposite
    Looking down the finished hips towards the bungalows opposite
  • Bottom courses lifted to reach the rafters and old battens
    Bottom courses lifted to reach the rafters and old battens

Crewe

3 photographs

  • Covering off and the roof timbers open, tiles stacked for reuse
    Covering off and the roof timbers open, tiles stacked for reuse
  • Old bitumen felt below the tile line, torn and holed through
    Old bitumen felt below the tile line, torn and holed through
  • Scaffold up at the gable end with the van on the drive
    Scaffold up at the gable end with the van on the drive

Liverpool

3 photographs

  • The stripped ridge with the yellow ventilated roll run out
    The stripped ridge with the yellow ventilated roll run out
  • Old clay ridge tiles stacked on the slope beside the tools
    Old clay ridge tiles stacked on the slope beside the tools
  • The ridge tiles refixed, clips showing between each one
    The ridge tiles refixed, clips showing between each one

Macclesfield

19 photographs

  • Before: crumbling crown, moss and plants rooted round the pots
    Before: crumbling crown, moss and plants rooted round the pots
  • The stack opened up, sooty flues and dividers laid bare
    The stack opened up, sooty flues and dividers laid bare
  • Rebuilt brickwork, new capping and vented cowls on every pot
    Rebuilt brickwork, new capping and vented cowls on every pot
  • The same stack before and after, from the scaffold
    The same stack before and after, from the scaffold
  • Both windows in, seen from the garden with the gable behind
    Both windows in, seen from the garden with the gable behind
  • Frame set in the opening with the grey underfelt collar dressed round
    Frame set in the opening with the grey underfelt collar dressed round
  • The finished window flush in the tiles, apron dressed down
    The finished window flush in the tiles, apron dressed down
  • Looking along the roof: one window done, one going in
    Looking along the roof: one window done, one going in
  • The opening cut, trimmed in timber and open to the store below
    The opening cut, trimmed in timber and open to the store below
  • Tiles off around the first position, drill down on the slope
    Tiles off around the first position, drill down on the slope
  • The stack from above with new lead dressed in around it
    The stack from above with new lead dressed in around it
  • Two new pots back in, rain cap on the taller one
    Two new pots back in, rain cap on the taller one
  • The new capping on top, pointing clean across every course
    The new capping on top, pointing clean across every course
  • Lead apron and back gutter seen from the far side
    Lead apron and back gutter seen from the far side
  • Scaffold up across the elevation, the roof area stripped ready for felting
    Scaffold up across the elevation, the roof area stripped ready for felting
  • Breathable membrane and new battens going on above the old mossy tiles
    Breathable membrane and new battens going on above the old mossy tiles
  • Battens run up the slope in courses, membrane lapped beneath each one
    Battens run up the slope in courses, membrane lapped beneath each one
  • Fixing battens near the ridge, tiles stacked clear on the boards
    Fixing battens near the ridge, tiles stacked clear on the boards
  • A course lifted at the eaves showing the torn old felt underneath
    A course lifted at the eaves showing the torn old felt underneath

Prestbury

5 photographs

  • Looking up at the slated side range from the driveway below
    Looking up at the slated side range from the driveway below
  • Down the slope, with a colleague steadying the ladder at the eaves
    Down the slope, with a colleague steadying the ladder at the eaves
  • A replacement slate slid home by hand into a standing course
    A replacement slate slid home by hand into a standing course
  • The relaid slope in sunlight, lead dressed down the valley
    The relaid slope in sunlight, lead dressed down the valley
  • Moss and leaf litter sitting in the lead valley before clearing
    Moss and leaf litter sitting in the lead valley before clearing

Sale

10 photographs

  • The kitchen roof before work, moss across the old interlocking tiles
    The kitchen roof before work, moss across the old interlocking tiles
  • Where the low roof meets the house wall, with the old lead at the junction
    Where the low roof meets the house wall, with the old lead at the junction
  • Close up of the old stepped lead, moss grown right up to the brickwork
    Close up of the old stepped lead, moss grown right up to the brickwork
  • Looking down the ridge line, moss along the tiles and the ridge joints
    Looking down the ridge line, moss along the tiles and the ridge joints
  • Stripped back and re-covered: new underlay and battens up to the hips
    Stripped back and re-covered: new underlay and battens up to the hips
  • Fresh battens running up the slope over the new breathable underlay
    Fresh battens running up the slope over the new breathable underlay
  • The renewed lead stepped down the brickwork and dressed over the tiles
    The renewed lead stepped down the brickwork and dressed over the tiles
  • The roof open to its bare rafters, debris still lying on the ceiling below
    The roof open to its bare rafters, debris still lying on the ceiling below
  • The stripped hip structure from above, everything cleared ready for underlay
    The stripped hip structure from above, everything cleared ready for underlay
  • Lifting the old tiles off, torn felt and battens showing behind
    Lifting the old tiles off, torn felt and battens showing behind

St Helens

4 photographs

  • Working the coping junction on the stand roof at St Helens RFC
    Working the coping junction on the stand roof at St Helens RFC
  • The coping run above the profiled metal sheeting, satellite dish alongside
    The coping run above the profiled metal sheeting, satellite dish alongside
  • Looking out over the pitch from the stand roof we were working on
    Looking out over the pitch from the stand roof we were working on
  • Close-up of the sealed bead where coping meets sheet, round the fixings
    Close-up of the sealed bead where coping meets sheet, round the fixings

Warrington

77 photographs

  • Ridge tiles lifted off and the new timber batten screwed down
    Ridge tiles lifted off and the new timber batten screwed down
  • The finished line, every tile held by a black clamp
    The finished line, every tile held by a black clamp
  • Ventilated roll run out along the batten, backing tape peeling away
    Ventilated roll run out along the batten, backing tape peeling away
  • Unrolling over the apex with the kit boxes beside us
    Unrolling over the apex with the kit boxes beside us
  • Looking down the completed ridge between the two panelled slopes
    Looking down the completed ridge between the two panelled slopes
  • Looking down on the finished apex, caps running down both slopes
    Looking down on the finished apex, caps running down both slopes
  • Screwing a cap into the batten end, bare tile edge ahead
    Screwing a cap into the batten end, bare tile edge ahead
  • Working up the gable off a roof ladder hooked over the slope
    Working up the gable off a roof ladder hooked over the slope
  • The gable apex from the garden, caps above the white bargeboard
    The gable apex from the garden, caps above the white bargeboard
  • Grey caps stepping down over the eaves and black gutter
    Grey caps stepping down over the eaves and black gutter
  • The finished garage roof, ridge and hip lines even again
    The finished garage roof, ridge and hip lines even again
  • Working along the hip with the ladder up to the gutter
    Working along the hip with the ladder up to the gutter
  • Moss and lichen over the old pantiles before anything came off
    Moss and lichen over the old pantiles before anything came off
  • The ridge closed back up, tiles clipped and screwed down
    The ridge closed back up, tiles clipped and screwed down
  • One tile seated on its union clip, screw driven home
    One tile seated on its union clip, screw driven home
  • Ridge roll run out along the apex, old tiles set aside
    Ridge roll run out along the apex, old tiles set aside
  • The roll dressed down over the tile courses, kit box open alongside
    The roll dressed down over the tile courses, kit box open alongside
  • Ridge tiles lifted off and the old bedding exposed
    Ridge tiles lifted off and the old bedding exposed
  • The old plain tiles on the kitchen roof before stripping began
    The old plain tiles on the kitchen roof before stripping began
  • Tiles off: worn battens and what was left of the felt
    Tiles off: worn battens and what was left of the felt
  • New breathable membrane down with treated battens set out across it
    New breathable membrane down with treated battens set out across it
  • The re-covered kitchen roof seen from the garden below
    The re-covered kitchen roof seen from the garden below
  • Working the covering up to the wall, drill and fixings to hand
    Working the covering up to the wall, drill and fixings to hand
  • The finished roof from above, edges squared off
    The finished roof from above, edges squared off
  • New leadwork along the wall abutment with the verge caps on
    New leadwork along the wall abutment with the verge caps on
  • The kitchen roof from the yard, dark covering against white render
    The kitchen roof from the yard, dark covering against white render
  • New white UPVC fascia and soffit running the length of the brick gable
    New white UPVC fascia and soffit running the length of the brick gable
  • The attached garage roof from the drive, plain tiles running up to the house wall
    The attached garage roof from the drive, plain tiles running up to the house wall
  • Breathable underlay down and battens fixed, tiles stacked ready to go back
    Breathable underlay down and battens fixed, tiles stacked ready to go back
  • Lower courses relaid over the new underlay, lead dressed at the wall
    Lower courses relaid over the new underlay, lead dressed at the wall
  • Stepped lead worked into the brick joints above the finished tile courses
    Stepped lead worked into the brick joints above the finished tile courses
  • The open section sheeted over with a tarpaulin between working days
    The open section sheeted over with a tarpaulin between working days
  • Looking down on the stripped slope, old tiles stacked clear to one side
    Looking down on the stripped slope, old tiles stacked clear to one side
  • A flat roof covering finished with its black edge trim beside the slated slope
    A flat roof covering finished with its black edge trim beside the slated slope
  • The finished hips and ridge seen from above, fixings spaced along each line
    The finished hips and ridge seen from above, fixings spaced along each line
  • New grey capping closing the hip mitre at the top of the roof
    New grey capping closing the hip mitre at the top of the roof
  • The new ridge lines, with older red clay capping on the roofs beyond
    The new ridge lines, with older red clay capping on the roofs beyond
  • Before: red clay hip tiles sitting in bedding that had crumbled away
    Before: red clay hip tiles sitting in bedding that had crumbled away
  • Before: powdery mortar broken out of the joints and spread down the slope
    Before: powdery mortar broken out of the joints and spread down the slope
  • The projecting gable from the ground, valley running where the two roofs meet
    The projecting gable from the ground, valley running where the two roofs meet
  • Battens going back down the stripped slope, broken cement cleared as we went
    Battens going back down the stripped slope, broken cement cleared as we went
  • New underlay and battens laid, roll and grey sheet lengths to hand
    New underlay and battens laid, roll and grey sheet lengths to hand
  • Before: moss growing the full length of the old cement valley
    Before: moss growing the full length of the old cement valley
  • New tiles chasing the membrane up the slope, valley cut in below
    New tiles chasing the membrane up the slope, valley cut in below
  • The front slope open to the rafters while the far end still carries its tiles
    The front slope open to the rafters while the far end still carries its tiles
  • Most of the slope re-covered, waste tiles loaded into the trailer
    Most of the slope re-covered, waste tiles loaded into the trailer
  • Bare rafters after the strip, old tiles stacked out on the garden
    Bare rafters after the strip, old tiles stacked out on the garden
  • The finished roof — one even tile colour across the whole bungalow
    The finished roof — one even tile colour across the whole bungalow
  • The valley where the two slopes meet, looking up from the ground
    The valley where the two slopes meet, looking up from the ground
  • The finished hip line, fresh mortar bedding running up to the ridge
    The finished hip line, fresh mortar bedding running up to the ridge
  • Working along the ridge with the tiles off, tools and buckets below
    Working along the ridge with the tiles off, tools and buckets below
  • Ridge tiles set out in rows on the lawn while the bed was cleared
    Ridge tiles set out in rows on the lawn while the bed was cleared
  • Close-up of the new bedding above the dark tiles and black gutter
    Close-up of the new bedding above the dark tiles and black gutter
  • The eaves and gable of the house where the wasps were getting in
    The eaves and gable of the house where the wasps were getting in
  • Working at the verge from the ladder, tools laid out below
    Working at the verge from the ladder, tools laid out below
  • Grey papery comb packed between the rafters and into the insulation
    Grey papery comb packed between the rafters and into the insulation
  • A section of tiles off, battens and underlay open across the slope
    A section of tiles off, battens and underlay open across the slope
  • The nest against the underlay, with felt and battens lifted back
    The nest against the underlay, with felt and battens lifted back
  • Blown render taken off back to the blockwork on the damp wall
    Blown render taken off back to the blockwork on the damp wall
  • Cracked and lifting render beside the patio doors before it came away
    Cracked and lifting render beside the patio doors before it came away
  • The stack capped off in fresh mortar, shaped to shed water
    The stack capped off in fresh mortar, shaped to shed water
  • Weathered brickwork and eroded joints on the stack, pots and cowls above
    Weathered brickwork and eroded joints on the stack, pots and cowls above
  • Moss along the top courses and capping slabs of the old stack
    Moss along the top courses and capping slabs of the old stack
  • The crumbling cement crown round the base of the pot before work
    The crumbling cement crown round the base of the pot before work
  • The renewed crown, sloped on all sides, with the cow re-bedded
    The renewed crown, sloped on all sides, with the cow re-bedded
  • The ridge line running away across the thick grey slates
    The ridge line running away across the thick grey slates
  • Cushions of moss growing out of the open ridge joints
    Cushions of moss growing out of the open ridge joints
  • The same ridge pointed up in fresh mortar, joints closed
    The same ridge pointed up in fresh mortar, joints closed
  • The old fillet cracked and broken away, with moss rooted in it
    The old fillet cracked and broken away, with moss rooted in it
  • Crumbling mortar round the flue terminal on the weathered stack
    Crumbling mortar round the flue terminal on the weathered stack
  • The crown re-flaunched in fresh mortar and shaped to fall away
    The crown re-flaunched in fresh mortar and shaped to fall away
  • The finished flaunching, sloped on every face to shed water
    The finished flaunching, sloped on every face to shed water
  • Working the new mortar off against the top course of brick
    Working the new mortar off against the top course of brick
  • The finished felt roof seen from the main roof above the garden
    The finished felt roof seen from the main roof above the garden
  • New decking sheets going down over the stripped joists
    New decking sheets going down over the stripped joists
  • Boarding out across the joists, the old insulation still in place
    Boarding out across the joists, the old insulation still in place
  • The finished roof on the brick outbuilding, ladder against the wall
    The finished roof on the brick outbuilding, ladder against the wall

Cheshire

4 photographs

  • Roofing work by Apex Roofing and Guttering
    Roofing work by Apex Roofing and Guttering
  • Roofing work by Apex Roofing and Guttering
    Roofing work by Apex Roofing and Guttering
  • Roofing work by Apex Roofing and Guttering
    Roofing work by Apex Roofing and Guttering
  • Roofing work by Apex Roofing and Guttering
    Roofing work by Apex Roofing and Guttering

Request a free quote

Tell us what the roof is doing and roughly where you are. We will come and look, and you get a written price before anything starts.

We use your details to reply to this enquiry and nothing else.