New battens, felt and slates fitted beside a dormer on a Warrington roof

The slates, felt and battens on one section of this Warrington roof were stripped off and replaced, working beside a dormer window and a lead gutter, with new slates laid on new battens and felt.

Call 07377 461095 Get a free quote

This Warrington roof is a slate roof with a dormer window set into it and a chimney stack behind. The work covered the slope beside the dormer, where the slates, the felt and the battens underneath were all taken off and renewed. The photographs follow it from the old roof to the new slates going back on.

The first photographs show the roof as it was and then with the slates stripped. What was left underneath was old black felt, split in places, laid over the old battens. Underneath that, in the section that was opened up furthest, you can see bare rafters with insulation between them and the lead gutter running across the foot of the slope.

What the job involved

  • Stripping the old slates from the section beside the dormer
  • Taking off the old felt and the old battens behind them
  • Fixing new battens, the red ones in the photographs, up the slope over new felt
  • Laying new slates onto the new battens, working up beside the dormer and the lead

Why the felt and battens matter

Slates get most of the attention, but they are only the outer layer. The felt underneath is the second line of defence when wind drives rain under a slate, and the battens are what every slate is actually fixed to. Old felt that has split, like the felt in the third photograph, stops doing its job even if the slates above it still look fine. Replacing slates without renewing what is under them leaves the weakest layer in place.

New battens set the lines the slates sit on, so the laying is even and the courses run straight. That is easier to see in the photographs of the red battens than it is in the finished slating.

Working beside a dormer and a lead gutter

A dormer and a lead gutter make the slating more fiddly than an open slope. The slates have to be cut to run tight into the dormer cheek and down to the gutter, and the lead needs to be left sitting properly under and over the slates around it. In the last two photographs the new slates run in beside the dormer window with the lead gutter alongside.

If your slate roof has slipped slates, a damp roof space or felt you can see is split, see our roof replacement and roof repairs pages, or our roof replacement in Warrington page. For lead around a dormer or chimney, see leadwork repairs.

Common questions

Why replace the felt and battens when the slates are being renewed?
The felt and battens sit under every slate. If they are old or split, the new slates are fixed to a weak base and the roof loses its second layer of protection against wind-driven rain, so they are renewed at the same time.
Does the whole roof have to be stripped?
Not always. On this job the work covered the slope beside the dormer. Whether a whole roof needs doing depends on the condition of what is underneath, which we check when we visit.
Do you work around dormers and lead gutters?
Yes. The slates have to be cut in neatly beside a dormer cheek and run down to the gutter, which takes more time than an open slope, and we look at the lead as part of the job.

Request a free quote

Tell us what the roof is doing and roughly where you are. We will come and look, and you get a written price before anything starts.

We use your details to reply to this enquiry and nothing else.