Re-covering and re-sealing a curved bay roof in Altrincham
A curved bay window roof in Altrincham stripped back, re-covered and re-sealed at the wall junction after weather damage. Photographs included.
Where a sloping roof runs into a wall, stepped lead flashing keeps the joint watertight. When it lifts, splits or loses its pointing, rainwater finds the gap quickly.
When a pitched roof runs up against a taller wall, such as a house gable, a neighbouring property or an extension, the junction is cut into the brickwork in steps. Stepped lead flashing follows that line, with each step set into a mortar joint and the lead dressed down onto the roof covering.
It is a simple detail when done well. Done badly, or left too long, it becomes a regular source of damp patches along the wall below the roofline.
A stain on the inside of the wall that follows the line of the roof is a good clue. Outside, look for a visible gap between the lead and the brickwork, lead hanging free, or long runs of silicone along the joint. Silicone is often a sign that someone has already tried to patch the problem.
Short lengths matter. Lead moves with temperature, and long pieces tend to crack or creep. Breaking the run into manageable sections allows for that movement.
The state of the wall, the type of roof covering and the roof pitch all matter. On some older properties the brickwork may be soft, so a deeper repair of the masonry is needed first. Lead thickness, or code, is chosen to suit the position.
If the wall is damp through poor pointing or a failed gutter, new flashing will not cure it alone. Where the roof covering at the abutment is failing too, it may be better to renew a larger section rather than patching around it.
Ask how long the lengths of lead will be, whether the joints will be repointed and what is being done about the tiles beside the wall. Clear answers show whether the job will be done properly.
If you have a stained wall below a roof junction, call to arrange a free inspection and a free quotation.
Call or message Apex Roofing for a free quotation.
Stepped flashing runs up a sloping edge where a roof meets a wall. An apron sits along a level junction, such as the base of a chimney or the foot of a wall that crosses the slope.
It may slow a leak for a short time, but mastic tends to harden and split. It also hides the real condition of the lead, which makes a later repair harder.
Usually yes, at least along the joints where the lead is held. Sound mortar is what keeps the flashing tight to the wall.
Real jobs photographed by Apex Roofing.
A curved bay window roof in Altrincham stripped back, re-covered and re-sealed at the wall junction after weather damage. Photographs included.
Damp near a chimney breast in Warrington traced to the stack. Joints repointed, new Code 4 lead fitted, the crown repaired and a water test run afterwards.
A leaking kitchen roof in Sale taken back to the rafters, re-covered on new breathable underlay and treated battens, with the lead at the wall renewed.
Apex Roofing covers Cheshire and the surrounding area. Choose your town for local information.
Apex Roofing Cheshire · 5 Weybridge Close, Warrington WA4 5LZ
Tell us about the property and what you have noticed and we will come back to you.
Prefer to talk? Call 07377 461095 · WhatsApp +44 7465 861265 · Email apexroofing14@gmail.com